Rehab Cost Estimate Calculator
Build a rehab budget from interior, exterior and roof, mechanical-electrical-plumbing, and permit and holding costs, then add a contingency percentage.
Rehab Cost Estimate Calculator
Background.
A rehab budget usually gets written twice: once on the walkthrough, with a contractor or a notepad, and again after the walls are open. The contingency line exists for the gap between those two versions, and the size of that gap decides whether a flip makes money or a newly bought rental cash-flows as planned.
The estimate is built from the bottom up, in four buckets that match how most scopes of work are organised. Interior work is what buyers and tenants see: kitchens, bathrooms, flooring, drywall, paint, doors and trim. Exterior and roof work is the envelope, from shingles and siding to gutters, decks and grading. Mechanical, electrical and plumbing is the systems money: furnace or heat pump, panel and wiring, supply and drain lines, water heater. The fourth bucket gathers costs that are not construction but still fall due before the property earns anything, such as permits, utilities and insurance while the house sits empty, property tax and loan interest during the project, dumpsters and final cleaning.
The four are added together and one contingency percentage is applied to the sum. With the defaults, 100,000 of scoped work and holding at 15% becomes a 115,000 budget.
Whether that figure means anything depends on two things. One is where each bucket came from: a priced scope with quantities and a contractor's line items, or a per-square-foot guess. The other is what sits behind the finishes. Houses built before 1978 may carry lead-based paint, and the EPA's Renovation, Repair and Painting rule requires certified firms for paid work that disturbs painted surfaces in them; its owner exemption does not cover houses that are rented out or flipped for profit. Knob-and-tube wiring, corroded drain lines and soft subfloor around a toilet are other classic finds. A contingency can absorb some of that, but a problem you already know about deserves its own line.
What is rehab cost estimate calculator?
A rehab cost estimate is the total cash you expect to need to take a property from its condition at purchase to the condition you intend to sell or rent it in. It is a budget rather than a bid: the sum of the scoped work in each category plus a contingency, which is money set aside for costs that are likely but cannot yet be pinned to a line item. The contingency is part of the money you must be able to fund, whether or not the job ends up spending it. The estimate leaves out the purchase price and the costs of selling.
How to use this calculator.
- Enter interior work as the total of your interior line items: kitchen, bathrooms, flooring, paint, drywall, doors, trim, fixtures and appliances. If one contractor's bid spans several categories, split it using the bid's own line items.
- Put roofing, siding, windows, gutters, decks, exterior paint and drainage under exterior and roof work, and heating, cooling, electrical and plumbing under mechanical, electrical and plumbing. A roof inspection and a camera scope of the sewer line before you commit are cheap compared with what either can reveal.
- Enter permits, holding and other costs: permit and inspection fees, utilities, vacant-property insurance, property tax and loan interest for the expected length of the project, plus dumpsters and cleanup. Holding costs accrue by the month, so price them on a realistic schedule, not the best case.
- Choose the contingency percentage. A cosmetic job on a thoroughly inspected house needs less; an older house with original systems, or work behind walls nobody has opened, needs more. The 15% default is a starting point.
- Read the total next to the contingency amount, and decide before work starts what the contingency is for: conditions you could not see, not upgrades added after the budget was set.
The formula.
The base cost is B = I + E + M + P, where I is interior work, E is exterior and roof work, M is mechanical, electrical and plumbing work, and P is permits, holding and other costs. The contingency is C = B × c ÷ 100 for the percentage c you enter, and the estimated total is T = B + C, which is the same as B × (1 + c ÷ 100). Every bucket is treated alike, so the contingency also lands on permit fees and holding costs. Some investors prefer to cushion construction only, reasoning that a permit fee is known to the dollar; others want a margin on holding precisely because schedules slip. To cushion construction only, enter zero in the permits and holding field and add that amount to the total yourself: on the defaults that gives 85,000 × 1.15 + 15,000 = 112,750 rather than 115,000. The contingency can be set anywhere from 0% to 100%. Because the relationship is linear, each extra percentage point adds 1% of the base, so 1,000 on the default 100,000.
A worked example.
The defaults describe a mid-sized rehab: 35,000 of interior work, 20,000 for exterior and roof, 30,000 for mechanical, electrical and plumbing, and 15,000 for permits, holding and other costs, with a 15% contingency. The base is 35,000 + 20,000 + 30,000 + 15,000 = 100,000. The contingency is 100,000 × 15 ÷ 100 = 15,000. The estimated total rehab cost is therefore 100,000 + 15,000 = 115,000. The 115,000 is the amount to arrange cash or loan draws for. Measured against it, the cushion is 15,000 ÷ 115,000, about 13% of the money on hand. If the job finishes without touching the contingency, that 15,000 was never a cost; it becomes reserve or profit. An overrun beyond 15,000 usually means the scope itself was wrong.
Frequently asked questions.
How large a contingency should a rehab carry?
Why is my contractor's bid lower than this total?
How does the rehab budget fit the 70% rule?
What changes if the house was built before 1978?
Are rehab costs deductible on a rental property?
Where does this total go in a flip analysis?
References& sources.
- [1]National Association of Realtors. Research and statistics. Retrieved 2026-08-07.
- [2]Fannie Mae Selling Guide B5-3.2-04, HomeStyle Renovation Mortgages: Costs and Escrow Accounts (12/10/2025). The contingency reserve covers renovation-related costs including labor, materials, fees and permits; it must be 10% of renovation costs on two- to four-unit properties, the lender may raise it to 15%, and it is released only for unforeseen repairs found during the work. Retrieved 2026-10-28.
- [3]U.S. Environmental Protection Agency. Lead Renovation, Repair and Painting Program. Anyone paid to perform work that disturbs paint in housing built before 1978 must be certified in lead-safe work practices, and landlords and property managers must comply when work in a rental disturbs paint. Retrieved 2026-10-28.
- [4]U.S. Internal Revenue Service. Tangible Property Final Regulations. Sets out the framework for deciding whether spending is a deductible repair or a capital improvement, with simplifying safe harbors including one for routine maintenance. Retrieved 2026-10-28.
How this page was produced
- Published by
- Quanta Calculator
- Overseen by
- Daniel, Quanta Calculator Researcher
- Primary sources
- 4 cited below
- Method
- rehab estimate = entered interior, exterior, systems, permit, holding and other costs x (1 + contingency)
- Published
- Last verified
Built with AI assistance and verified by automated tests against the cited sources — every worked example on this page is computed by the same code that runs the calculator. How we build and check calculators.
In this category
Embed
Quanta Pro
Paid features are coming later.
- All 1560 calculators remain free
- No billing is enabled