Rehab Cost Estimate Calculator

Build a rehab budget from interior, exterior and roof, mechanical-electrical-plumbing, and permit and holding costs, then add a contingency percentage.

Rehab Cost Estimate Calculator

$
%
Estimated total rehab cost
115,000.00
Total rehab budget in your currency: the four entered cost categories plus the contingency amount.
Base entered rehab cost
100,000.00
Contingency amount
15,000.00

Background.

A rehab budget usually gets written twice: once on the walkthrough, with a contractor or a notepad, and again after the walls are open. The contingency line exists for the gap between those two versions, and the size of that gap decides whether a flip makes money or a newly bought rental cash-flows as planned.

The estimate is built from the bottom up, in four buckets that match how most scopes of work are organised. Interior work is what buyers and tenants see: kitchens, bathrooms, flooring, drywall, paint, doors and trim. Exterior and roof work is the envelope, from shingles and siding to gutters, decks and grading. Mechanical, electrical and plumbing is the systems money: furnace or heat pump, panel and wiring, supply and drain lines, water heater. The fourth bucket gathers costs that are not construction but still fall due before the property earns anything, such as permits, utilities and insurance while the house sits empty, property tax and loan interest during the project, dumpsters and final cleaning.

The four are added together and one contingency percentage is applied to the sum. With the defaults, 100,000 of scoped work and holding at 15% becomes a 115,000 budget.

Whether that figure means anything depends on two things. One is where each bucket came from: a priced scope with quantities and a contractor's line items, or a per-square-foot guess. The other is what sits behind the finishes. Houses built before 1978 may carry lead-based paint, and the EPA's Renovation, Repair and Painting rule requires certified firms for paid work that disturbs painted surfaces in them; its owner exemption does not cover houses that are rented out or flipped for profit. Knob-and-tube wiring, corroded drain lines and soft subfloor around a toilet are other classic finds. A contingency can absorb some of that, but a problem you already know about deserves its own line.

What is rehab cost estimate calculator?

A rehab cost estimate is the total cash you expect to need to take a property from its condition at purchase to the condition you intend to sell or rent it in. It is a budget rather than a bid: the sum of the scoped work in each category plus a contingency, which is money set aside for costs that are likely but cannot yet be pinned to a line item. The contingency is part of the money you must be able to fund, whether or not the job ends up spending it. The estimate leaves out the purchase price and the costs of selling.

How to use this calculator.

  1. Enter interior work as the total of your interior line items: kitchen, bathrooms, flooring, paint, drywall, doors, trim, fixtures and appliances. If one contractor's bid spans several categories, split it using the bid's own line items.
  2. Put roofing, siding, windows, gutters, decks, exterior paint and drainage under exterior and roof work, and heating, cooling, electrical and plumbing under mechanical, electrical and plumbing. A roof inspection and a camera scope of the sewer line before you commit are cheap compared with what either can reveal.
  3. Enter permits, holding and other costs: permit and inspection fees, utilities, vacant-property insurance, property tax and loan interest for the expected length of the project, plus dumpsters and cleanup. Holding costs accrue by the month, so price them on a realistic schedule, not the best case.
  4. Choose the contingency percentage. A cosmetic job on a thoroughly inspected house needs less; an older house with original systems, or work behind walls nobody has opened, needs more. The 15% default is a starting point.
  5. Read the total next to the contingency amount, and decide before work starts what the contingency is for: conditions you could not see, not upgrades added after the budget was set.

The formula.

rehab estimate = entered interior, exterior, systems, permit, holding and other costs x (1 + contingency)

The base cost is B = I + E + M + P, where I is interior work, E is exterior and roof work, M is mechanical, electrical and plumbing work, and P is permits, holding and other costs. The contingency is C = B × c ÷ 100 for the percentage c you enter, and the estimated total is T = B + C, which is the same as B × (1 + c ÷ 100). Every bucket is treated alike, so the contingency also lands on permit fees and holding costs. Some investors prefer to cushion construction only, reasoning that a permit fee is known to the dollar; others want a margin on holding precisely because schedules slip. To cushion construction only, enter zero in the permits and holding field and add that amount to the total yourself: on the defaults that gives 85,000 × 1.15 + 15,000 = 112,750 rather than 115,000. The contingency can be set anywhere from 0% to 100%. Because the relationship is linear, each extra percentage point adds 1% of the base, so 1,000 on the default 100,000.

A worked example.

Example

The defaults describe a mid-sized rehab: 35,000 of interior work, 20,000 for exterior and roof, 30,000 for mechanical, electrical and plumbing, and 15,000 for permits, holding and other costs, with a 15% contingency. The base is 35,000 + 20,000 + 30,000 + 15,000 = 100,000. The contingency is 100,000 × 15 ÷ 100 = 15,000. The estimated total rehab cost is therefore 100,000 + 15,000 = 115,000. The 115,000 is the amount to arrange cash or loan draws for. Measured against it, the cushion is 15,000 ÷ 115,000, about 13% of the money on hand. If the job finishes without touching the contingency, that 15,000 was never a cost; it becomes reserve or profit. An overrun beyond 15,000 usually means the scope itself was wrong.

allowance Percent10
quantity100
unit Cost25
exterior And Roof Work20,000
interior Work35,000
mechanical Electrical Plumbing30,000
contingency Percent15
permits Holding And Other15,000

Frequently asked questions.

How large a contingency should a rehab carry?
There is no universal figure; it should shrink as uncertainty shrinks. A fixed-price bid on cosmetic work in an inspected house justifies a small one. Original plumbing and wiring, a roof of unknown age, or plans to open walls justify more. Renovation lenders often build a contingency reserve into the loan, FHA's 203(k) mortgage among them.
Why is my contractor's bid lower than this total?
A bid prices the contractor's construction scope. It usually leaves out permits you pull yourself, owner-supplied materials and appliances, utilities, insurance, taxes and loan interest while the house sits empty, and of course your contingency. Change orders during the job come out of that contingency, not out of the bid.
How does the rehab budget fit the 70% rule?
The 70% rule is a flipper's rule of thumb: offer no more than 70% of the after-repair value minus repair costs. For a house worth 300,000 once finished, 210,000 less the default 115,000 leaves a maximum offer of 95,000. Using the 100,000 base without contingency would raise it to 110,000, which is how thin margins start.
What changes if the house was built before 1978?
Plan for lead-safe work. The EPA requires certified renovation firms for paid work that disturbs painted surfaces in pre-1978 homes, and its homeowner exemption does not apply to rentals or flips. Testing, containment and specialised cleanup add cost, so give them their own line rather than hoping the contingency covers them.
Are rehab costs deductible on a rental property?
Not all at once. IRS Publication 527 (2025) says you must capitalize any expense that improves a rental property and recover it through depreciation, while ordinary repairs are deductible. This estimate does not separate the two, so mark which line items are improvements and confirm the treatment with a tax adviser.
Where does this total go in a flip analysis?
The Fix and Flip Profit calculator takes rehab, holding and financing costs as one combined figure, so the total from here can be entered there. Check that you have not counted loan interest twice: if it is already in the permits, holding and other field, leave it out of the flip's financing cost.

How this page was produced

Published by
Quanta Calculator
Primary sources
4 cited below
Method
rehab estimate = entered interior, exterior, systems, permit, holding and other costs x (1 + contingency)
Published
Last verified

Built with AI assistance and verified by automated tests against the cited sources — every worked example on this page is computed by the same code that runs the calculator. How we build and check calculators.

Embed

Quanta Pro

Paid features are coming later.

  • All 1560 calculators remain free
  • No billing is enabled
Coming soon