Tenant Improvement Allowance Calculator
Work out how much of a commercial build-out the landlord's tenant-improvement allowance covers, from leased area, rate per square foot and eligible cost.
Tenant Improvement Allowance Calculator
Background.
Forty-five per square foot sounds generous until the pricing for the build-out comes in at a little over 54. On 12,000 square feet that gap is 110,000, and unless the lease says otherwise it is the tenant's to fund.
A tenant-improvement allowance is the landlord's contribution toward fitting out leased commercial space: partitions, ceilings, lighting, finishes, and the electrical and mechanical changes a new layout needs. It is negotiated together with the rent and the term, usually stated as an amount per square foot, and governed by a work letter that says which costs qualify, how and when the money is paid, and what happens to any part left unspent.
The calculation follows a work letter at its simplest. The maximum allowance is the leased area times the rate per square foot. The landlord pays eligible costs up to that maximum; anything beyond it is the tenant's, and if the work costs less than the maximum the landlord pays only the actual cost. With the defaults, 12,000 square feet at 45 makes a 540,000 maximum against 650,000 of eligible work, so the landlord's share is 540,000 and the tenant covers the remainder.
Three lease terms move the answer more than the arithmetic does. The first is the area basis: a rate per rentable square foot, which includes a share of the building's common areas, yields more than the same rate on usable area. The second is the definition of eligible cost, since design fees, permits, cabling, furniture and moving are often limited or excluded, so a 650,000 project may contain less than 650,000 of eligible cost. The third is unspent money, which often lapses unless the lease converts it into a rent credit.
What is tenant improvement allowance calculator?
A tenant-improvement allowance is money a landlord agrees to contribute toward altering commercial space for a tenant, capped at a negotiated rate per square foot times the leased area. The landlord's actual outlay is the lesser of that cap and the eligible cost of the work. Eligible cost above the cap falls to the tenant, and an allowance that is not fully used is simply not paid out unless the lease provides otherwise. It is part of the lease economics rather than a gift: landlords recover it through the rent and the length of the term.
How to use this calculator.
- Enter the leased area on the basis the allowance clause uses. Check whether the lease says rentable or usable square feet; the two can differ by the building's common-area share.
- Enter the allowance per square foot from the lease or letter of intent. If the allowance is a fixed sum instead, enter that sum as the rate and set the area to 1.
- Enter the eligible tenant-improvement cost: the part of the construction budget the work letter lets the allowance pay for. Remove excluded items such as furniture, IT equipment or moving, and apply any cap on design and permit fees.
- Read the landlord allowance used and the tenant cost above allowance together. When the cost is below the maximum, the unused allowance output shows how much of it you would leave on the table.
The formula.
The maximum allowance is M = A × a, where A is the leased area in square feet and a the allowance per square foot. The landlord allowance used is U = min(M, C), with C the eligible improvement cost, and the tenant's cost above the allowance is max(C − M, 0). When C is below M, nothing falls to the tenant and M − U goes unused; that figure is the unused allowance output, max(M − C, 0). A 480,000 build-out against the default 540,000 maximum would leave 60,000 unspent. The model is one cap with no sub-limits, so soft-cost caps and exclusions have to be reflected in the eligible cost you enter. Timing is also outside it. Allowances are frequently paid as reimbursement once work is complete and documented, which means the tenant may have to finance the whole project in the meantime. The leased area must be greater than zero.
A worked example.
The defaults are 12,000 square feet of leased area, an allowance of 45 per square foot and 650,000 of eligible improvement cost. The maximum allowance is 12,000 × 45 = 540,000. Eligible cost is higher, so the landlord allowance used is the smaller of the two, min(540,000, 650,000) = 540,000. The tenant's cost above the allowance is 650,000 − 540,000 = 110,000, about 9.17 per square foot. How that 110,000 gets paid is itself negotiable. Some landlords will advance the excess as an additional allowance and recover it through the rent. Suppose it were amortized over a 10-year term at 8% a year: the monthly payment works out to 1,334.60, about 1.33 per square foot per year on top of the base rent, and 160,152.42 over the full term.
Frequently asked questions.
Is the allowance based on rentable or usable square feet?
What happens to allowance I do not use?
Which costs count as eligible improvements?
When does the landlord actually pay the allowance?
Is a larger allowance always the better deal?
How does a tenant account for the allowance?
References& sources.
- [1]Financial Accounting Standards Board. Accounting Standards Codification. Retrieved 2026-08-07.
- [2]U.S. General Services Administration, Public Buildings Service. Pricing Desk Guide, 5th edition (effective August 1, 2020), section 2.5.8, Amortization of Tenant Improvement Allowances. In leased space only the portion of the allowance actually spent is amortized into the rent, starting on completion and acceptance of the buildout and usually ending with the firm term, and unspent allowance cannot be banked for later. Retrieved 2026-10-28.
- [3]Financial Accounting Standards Board. Accounting Standards Update 2016-02, Leases (Topic 842), as issued February 2016. Lease incentives include payments made to or on behalf of the lessee, and a lessee's lease payments are its fixed payments less any lease incentives paid or payable to it (paragraph 842-10-30-5). Retrieved 2026-10-28.
- [4]26 U.S.C. 110, Qualified lessee construction allowances for short-term leases. Cash a lessor gives a retail tenant on a lease of 15 years or less to build or improve the space is excluded from the tenant's income only up to the amount the tenant actually spends on the work. Retrieved 2026-10-28.
How this page was produced
- Published by
- Quanta Calculator
- Overseen by
- Daniel, Quanta Calculator Researcher
- Primary sources
- 4 cited below
- Method
- allowance used = min(leased area x negotiated allowance per square foot, eligible tenant-improvement cost)
- Published
- Last verified
Built with AI assistance and verified by automated tests against the cited sources — every worked example on this page is computed by the same code that runs the calculator. How we build and check calculators.
In this category
Embed
Quanta Pro
Paid features are coming later.
- All 1560 calculators remain free
- No billing is enabled