Background.

Crushed stone is sold by weight and laid by volume, and most ordering mistakes happen in the conversion between the two. The quarry or builders' merchant quotes per tonne; the drawing says a patch 6 metres by 3 metres needs 100 mm of compacted base. Getting from one to the other takes three things: the volume of the finished layer, an allowance for the stone that disappears into compaction, spillage and an uneven subgrade, and the bulk density of the particular product being delivered.

Bulk density is the figure that does the most damage when guessed. A heap of crushed stone is partly air, the gaps between angular fragments, so a cubic metre of it weighs far less than solid rock, which for granite is about 2,700 kg/m³. How much less depends on the grading, the moisture and whether the stone is loose in a lorry bed or rolled tight in place. ASTM C29, the standard test for aggregate bulk density, has both a loose (shovelled) procedure and compacted (rodded or jigged) ones precisely because the two give different answers. The 1,600 kg/m³ default is a placeholder, not a property of crushed stone in general: replace it with your supplier's figure for the product you are buying.

The allowance has to match the density you use. With a loose density, it must cover the volume lost when the layer is plated or rolled as well as waste. With a compacted density, it only needs to cover spillage and trimming.

The tonnage is a quantity to order against, not a delivery ticket. Suppliers round to their own load sizes and minimum orders, and some sell by the cubic yard or the short ton.

What is crushed stone calculator?

The order mass is the weight of crushed stone to buy so that, once spread and compacted, it fills a rectangular area to a stated depth. It is the compacted volume (length × width × compacted depth), enlarged by a percentage allowance and then multiplied by a bulk density: the mass of stone per cubic metre of space it occupies, with the voids between particles counted in. Because bulk density belongs to a specific graded product in a specific state rather than to rock in general, the page asks you for it instead of looking one up from a material name.

How to use this calculator.

  1. Measure the length and width of the area in metres. For an L-shaped or irregular area, split it into rectangles, run each one and add the tonnages.
  2. Enter the compacted depth, meaning the thickness of the finished layer after rolling rather than the loose depth before it. A 100 mm base is entered as 0.1.
  3. Replace the bulk density with your supplier's figure for the exact product (a 20 mm clean stone and a graded sub-base are not the same), and find out whether it is a loose or a compacted density.
  4. Set the allowance: with a loose density, make it large enough to cover compaction as well as waste; with a compacted density, a smaller margin for spillage and low spots in the subgrade will do.
  5. Order on the tonnes figure, rounding up to the supplier's load size, and keep the order volume to hand in case they sell by the cubic metre.

The formula.

Order mass = L×W×D × (1+waste%) × bulk density

The calculation runs in three steps. First the compacted volume, V = L × W × D, in cubic metres. Second the order volume, V_order = V × (1 + a/100), where a is the waste and compaction allowance in percent. Third the mass, M = V_order × ρ ÷ 1,000, where ρ is the bulk density in kg/m³ and dividing by 1,000 turns kilograms into metric tonnes. Every term is a plain multiplier, so a 10% error in any one of them becomes a 10% error in the tonnage. Depth and density are the two to watch. Depth, because 50 mm extra on a 100 mm layer is a 50% increase that is easy to overlook when the base is being levelled. Density, because differences in grading and moisture between products are real and cannot be judged by eye. Nothing in the formula follows the shape of the ground under the layer; if the subgrade dips, raise the allowance to cover it.

A worked example.

Example

Take a parking pad 6 m long and 3 m wide with a 100 mm (0.1 m) compacted base. The compacted volume is 6 × 3 × 0.1 = 1.8 m³. An 8% allowance raises that to 1.8 × 1.08 = 1.944 m³ of stone to order. At a bulk density of 1,600 kg/m³, 1.944 × 1,600 = 3,110.4 kg, which the page reports as 3.1104 tonnes. The density assumption moves the answer as much as the allowance does: at 1,700 kg/m³ the same pad needs 3.3048 t, and at 1,500 kg/m³ it needs 2.916 t. Thickening the base to 150 mm pushes the order to 4.6656 t, a bigger jump than either density change. A merchant selling in US short tons would call 3.1104 t about 3.43 short tons.

depth0.1
bulk Density1,600
length6
waste Percent8
width3

Frequently asked questions.

Should I enter the depth of stone before or after compaction?
After. The depth field is the finished, compacted thickness you want on site, because that is the dimension a plan or specification gives. The extra loose stone needed to reach it is handled by the allowance, or by using a compacted bulk density, not by inflating the depth.
Why does my supplier quote a different tonnage for the same area?
Usually because their bulk density differs from the one entered here. Grading, rock type and moisture all change the mass of a cubic metre of stone. Suppliers also round up to full loads and may apply their own compaction factor, so ask which density and factor they used and enter those.
How big should the waste and compaction allowance be?
It depends on how the density was measured. With a loose density the allowance must cover settlement under the roller as well as spillage, so ask the supplier what compaction factor they expect for that product. The 8% default is a general starting margin, not a tested compaction factor.
Does wet stone change how much I should order?
It changes the weight more than the volume. Stone that has sat in an open stockpile after rain carries water, so each tonne delivered holds slightly less rock. Laboratory bulk densities are usually measured on dried aggregate, so a wet delivery can leave you a little short if you ordered to the exact figure.
How do I convert the result to cubic yards or short tons?
One cubic metre is about 1.308 cubic yards, so the example's 1.944 m³ order volume is roughly 2.54 yd³. One metric tonne is about 1.102 US short tons, because a short ton is 2,000 lb, or 907.18 kg.
Can I use this for a curved path or a round patio?
Only indirectly, since it multiplies length by width. Break a path into straight sections and add them, or for a circle enter a length and width whose product equals the circle's area, π × radius². The depth, density and allowance work the same way whatever the outline.

How this page was produced

Published by
Quanta Calculator
Primary sources
3 cited below
Method
Order mass = L×W×D × (1+waste%) × bulk density
Published
Last verified

Built with AI assistance and verified by automated tests against the cited sources — every worked example on this page is computed by the same code that runs the calculator. How we build and check calculators.

In this category

Embed

Quanta Pro

Paid features are coming later.

  • All 1560 calculators remain free
  • No billing is enabled
Coming soon