Kitchen Remodel Cost Calculator

Add up a kitchen remodel from cabinets and countertops, appliances and fixtures, labor and trades, and permit and design fees, then apply a contingency reserve.

Kitchen Remodel Cost Calculator

$
%
Estimated kitchen-remodel cost
82,800.00
Base project cost plus the contingency reserve, in the currency of your entries: the funding to have arranged before demolition.
Base entered project cost
72,000.00
Contingency amount
10,800.00

Background.

A kitchen remodel is four purchases with very different personalities. Cabinets and countertops are ordered well ahead and set the schedule. Appliances look like a catalogue choice but quietly decide much of the electrical, gas and ventilation work. Labor and trades are where layout decisions turn into hours. Design and permit fees are the smallest line and the first to be paid. An estimate that keeps the four apart tells you far more than a single price per square foot can.

That is the structure used here. Enter what you expect to spend on cabinetry and countertops, appliances and fixtures, labor and trade work, and permit and design, then a contingency percentage. The four figures are added to give the base project cost; the contingency is the base times your percentage; the estimate is the two together. The defaults — 72,000 of priced work and a 15% reserve — come to 82,800.

The appliance line deserves a closer look than its price tag suggests. Moving from gas to an induction range means a 240-volt circuit and possibly a larger electrical service. A powerful range hood has to be ducted outdoors, and above 400 cubic feet per minute it can trigger a makeup-air requirement. Those costs land in labor and trade work, not in the appliance line, so pick appliances before you ask for trade quotes.

The calculator holds no price data of its own and knows nothing about your region or finish level; it adds and multiplies what you give it. That is a strength when you are comparing bids, because a difference between two contractors shows up in one line instead of disappearing into a total, and a weakness only if the figures you enter are stale or incomplete.

What is kitchen remodel cost calculator?

A kitchen remodel estimate is the money you need to have available to take a kitchen from its current state to finished, built up from the parts of the job. Here the base project cost is the total of four lines: cabinetry and countertops, appliances and fixtures, labor and trade work, and permit and design. The contingency is a reserve calculated as a percentage of that base, set aside for what cannot be priced before demolition — a rotted sill under the sink, an undersized electrical panel, a wall that turns out to be load-bearing. The estimated remodel cost is base plus reserve. Notice what has no line of its own: flooring, lighting, backsplash tile, drywall and paint. Put each one in whichever line the quote that covers it belongs to, and count it once.

How to use this calculator.

  1. In Cabinetry and countertops, enter cabinet boxes, doors, panels, hardware and installation, plus countertops with fabrication, templating, sink and cooktop cutouts, and any matching backsplash slab.
  2. In Appliances and fixtures, enter the range or cooktop and ovens, hood, refrigerator, dishwasher and microwave, along with the sink, faucet, disposal and light fixtures. Include delivery, haul-away of old units and sales tax if you will pay them.
  3. In Labor and trade work, enter demolition, carpentry, drywall, flooring, tile setting and painting, together with the plumbing, electrical, gas and duct work. If the flooring material is bought separately, add it here so it has a home.
  4. Enter design, engineering and permit fees in Permit and design cost. If a cabinet showroom includes design in its price, it is already in the cabinetry line; leave it out here.
  5. Set the contingency allowance — 15% by default. Raise it for an older house, a wall coming out or a moved sink or range; it can come down once demolition is finished and nothing unexpected turned up.

The formula.

kitchen remodel estimate = entered cabinetry, appliance, labor, trade, permit and design costs x (1 + contingency)

Estimated cost = (C + A + L + D) × (1 + r ÷ 100). C is cabinetry and countertops, A is appliances and fixtures, L is labor and trade work, D is permit and design, and r is the contingency percentage. The sum in brackets is the base project cost, and the contingency amount is that base × r ÷ 100.

The model is linear, so each line contributes to the total in exact proportion to its size: every 1,000 added to or cut from any line moves the estimate by 1,150 at the default 15%. The arithmetic is identical to the bathroom remodel cost calculator's; the difference lies in how the work is grouped, with kitchens split around cabinets and appliances rather than fixtures and finishes.

One consequence of a percentage reserve is worth thinking through. The contingency grows with the price of cabinets and appliances, yet a dearer refrigerator does not make hidden rot more likely; the risk of surprises follows the construction scope — walls opened, plumbing and gas moved, an old panel reused. If you would rather size the reserve to the risk, choose the sum you want held back and convert it: a 6,000 reserve on the 72,000 default base is a rate of 8.33%. In the other direction, a modest kitchen that moves the sink and takes down a wall may need more than 15%.

No price escalation, regional adjustment, financing cost or tax is added. Producer price indexes from the Bureau of Labor Statistics track how construction inputs such as lumber, gypsum and copper change in price, which is reason enough to re-quote a plan that has been on hold for a season.

A worked example.

Example

Use the defaults: 30,000 for cabinetry and countertops, 15,000 for appliances and fixtures, 22,000 for labor and trade work, 5,000 for permit and design, and a 15% contingency. The base project cost is 30,000 + 15,000 + 22,000 + 5,000 = 72,000. The contingency is 72,000 × 0.15 = 10,800. The estimated kitchen-remodel cost is 72,000 + 10,800 = 82,800. As shares of the base, cabinetry and countertops are 41.67%, labor and trades 30.56%, appliances 20.83% and permit and design 6.94%. Because the reserve is proportional, each line carries its share of it: the cabinet line alone accounts for 30,000 × 1.15 = 34,500 of the 82,800. The 82,800 is the figure to have arranged before demolition begins, not the expected final bill. If the walls open cleanly, the project finishes near 72,000; the reserve is there because the middle of a remodel, with the kitchen gutted, is the worst time to look for extra money. The same inputs work as a re-forecast once the walls are open. Suppose demolition found a damaged subfloor that raised labor and trade work to 24,500, and the other lines held. With most unknowns now exposed, a much smaller rate is defensible. At 5%, the revised base of 74,500 gives an estimate of 74,500 × 1.05 = 78,225, which is 4,575 below the original figure even after paying for the repair.

allowance Percent10
quantity100
unit Cost25
permit And Design Cost5,000
labor And Trade Work22,000
appliances And Fixtures15,000
contingency Percent15
cabinetry And Counters30,000

Frequently asked questions.

Why does the countertop price often change after the cabinets are installed?
Stone and quartz fabricators usually template the counters on the installed base cabinets, so the final dimensions, seam locations and cutouts are fixed only then. Changes between the early quote and the template — a larger island overhang, an added cooktop cutout, a different edge profile, extra slab for a waterfall end — are priced at that point. Ask for the quote to state the square footage and the cutouts it assumes, and keep some of your reserve in mind for the template visit.
What does switching from gas to an induction range add beyond the appliance?
An electric or induction range needs a dedicated 240-volt circuit sized for that appliance, and an older panel may not have the room or capacity for it, which can turn a simple circuit into a panel or service upgrade. The old gas line has to be capped safely. All of that belongs in labor and trade work. Ask the electrician to check the panel before you buy the range, not after.
Where does taking out a wall go in the estimate?
Split it between two lines. The engineer's design for a load-bearing wall goes in permit and design; the beam, temporary shoring, posts carried down to adequate support, and the patching of floor, ceiling and walls go in labor and trade work. Walls also hide wiring, plumbing vents and ducts that must be rerouted. Because the inside of a wall is unknown until it is opened, a project that removes one justifies a larger contingency.
Does a big range hood need makeup air?
It can. Recent editions of the International Residential Code require makeup air for a kitchen exhaust system capable of more than 400 cubic feet per minute when the home has a fuel-burning appliance that is neither direct-vent nor mechanically vented — an older furnace or water heater, for example — inside its air barrier. A makeup-air system adds ductwork, a motorized damper and controls. Check the edition your jurisdiction adopted, and price the hood and its ventilation together.
How many counter outlets will the inspector expect?
Under the IRC's electrical chapters, which follow the National Electrical Code, countertop receptacles must be placed so that no point along the wall line of a counter space at least 12 inches wide is more than 24 inches from an outlet. They must be GFCI-protected and fed by at least two 20-ampere small-appliance circuits. A remodel that opens the walls is the natural moment to meet these rules; price it in labor and trade work.
Can I keep or reface the existing cabinets?
Yes, and the calculator handles it without change: enter the cost of refacing, painting or new doors and hardware in the cabinetry and countertops line instead of new boxes. Keeping the boxes usually means keeping the layout, which also holds down plumbing, gas and electrical work. Inspect the sink base and the cabinets beside the dishwasher before committing, since a slow leak at either shows up there.
Which line takes flooring, lighting, backsplash and paint?
None of the four labels names them, so assign each by who supplies it. Light fixtures you buy go with appliances and fixtures; the electrician's time to install them goes in labor and trade work. Flooring, backsplash tile, drywall and paint are usually supplied and installed by the general contractor or a sub, so labor and trade work is their natural home. Decide too whether the new floor runs under the cabinets or stops at them: running it under uses more material but leaves room for a later layout change, while many floating-floor makers forbid pinning their floors under cabinets at all. What matters is that each item appears once and nothing on the plan is left without a line.
What costs sit outside this estimate altogether?
Living without a kitchen: takeout, a temporary sink and microwave elsewhere in the house, perhaps storage for displaced contents. Financing costs if the project is borrowed. Sales tax on materials, unless you included it in a line. Furniture, window treatments and decorating. None of these flows through the formula, so add them to your own budget beside the estimate rather than inflating the contingency to cover them.
How should payments be scheduled against the estimate?
Most remodeling contracts take a deposit and then progress payments tied to milestones such as demolition, rough-in inspection, cabinet installation and completion. Some states cap the deposit; California, for example, limits the down payment on a home improvement contract to 1,000 dollars or 10% of the price, whichever is less. Cabinets and appliances ordered early may require payment to the supplier up front, so expect cash to be needed earlier than the work progresses.
What moves the cabinetry line most?
Construction grade more than the number of boxes. Stock cabinets come in fixed sizes, usually in 3-inch width steps, with filler strips closing the gaps; semi-custom lines allow changes to depth, finish and interior fittings; custom cabinets are built to the room's exact dimensions. Door style, finish, drawer count and specialty inserts add on top. Ask for the quote itemized cabinet by cabinet, so you can see whether savings lie in the grade, the fittings or the layout itself.

How this page was produced

Published by
Quanta Calculator
Primary sources
5 cited below
Method
kitchen remodel estimate = entered cabinetry, appliance, labor, trade, permit and design costs x (1 + contingency)
Published
Last verified

Built with AI assistance and verified by automated tests against the cited sources — every worked example on this page is computed by the same code that runs the calculator. How we build and check calculators.

In this category

Embed

Quanta Pro

Paid features are coming later.

  • All 1560 calculators remain free
  • No billing is enabled
Coming soon