Audited 27 Jul 2026·Last updated 28 Oct 2026·5 citations·Tier 1·0 uses

Tile Calculator

How many tiles and boxes to buy for a floor or wall: tile count from area, tile size and grout joint, plus your waste allowance, box rounding and cost.

Tile Calculator

Waste-adjusted tile count
66
Tiles to buy: the raw count plus your waste percentage, rounded up to a whole tile.
Grout-adjusted tile module area
2.0314
Raw tile count (before waste)
60
Box count
9
Estimated material cost
378.00

Background.

The question usually arrives as one measurement and a tile already chosen: a 120-square-foot bathroom floor and a 12 × 24 inch porcelain, say. Each of those tiles covers 2 square feet, so 60 tiles would cover the floor on paper. That is not the number to carry to the checkout. Tiles along the walls get cut and their offcuts rarely fit anywhere else, a few crack under the cutter or arrive chipped, and the store sells the product in sealed cartons rather than by the piece. What you get here is the shopping quantity: whole tiles, a waste allowance on top of them, then whole boxes and what they cost.

Grout is counted as well. Each tile is treated as claiming its own face plus one joint along a long edge and one along a short edge, so a 12 × 24 tile laid with 1/8-inch joints occupies 12.125 by 24.125 inches. For a tile that size the joint adds only about 1.6% to its footprint. Around a 4-inch square the same joint adds more than 6%, which on 60 square feet of small tile takes more than 30 pieces off the order.

The waste percentage is a judgement about the layout. Ten percent is the usual starting allowance for a straight grid in a plain rectangular room; diagonal and herringbone patterns, rooms full of corners and pipes, and long tiles that have to be staggered all call for more. Because the count is then rounded up to whole cartons, part of any allowance is often absorbed by the box you were going to buy anyway.

There is a second reason not to cut the order fine. Tile is fired in production runs, and cartons carry shade and caliber codes because one run can differ from the next in colour and very slightly in size. Going back for one more box after the floor is half laid risks a carton that does not match, and leftover tiles from the original lot are the only repair stock you can rely on when a tile cracks years later.

The method fits any flat surface covered with a single tile size: floors, walls, backsplashes, shower surrounds. It does not draw the layout, so it cannot say where the cut rows will fall, and it leaves out trim pieces, thinset, grout and backer board.

What is tile calculator?

A tile estimate is really three counts stacked on one another. The raw count is how many grout-adjusted tile footprints fit into the area, rounded up, because a fraction of a tile still has to be a whole tile. The tiles-to-buy count adds the waste allowance to that figure and rounds up again. The box count divides by the number of pieces in a carton and rounds up a third time, since no store will split a box. Each step can only add tiles, so the cartons you pay for always hold at least the waste-adjusted count and usually a few more. The module area, in square feet, is reported alongside: it is what one tile plus its share of the grout lines covers, and dividing your area by it is where the whole estimate starts.

How to use this calculator.

  1. Enter the Project area in square feet. Measure length and width in feet and multiply; split an L-shaped room into rectangles and add them; for wall tile, subtract windows and doors. If your plan is in square metres, multiply by 10.764.
  2. Enter Tile length and Tile width in inches from the product specification rather than the name on the label. A tile sold as 12 × 24 may be a metric 300 × 600 mm piece, which measures 11.81 × 23.62 inches; divide millimetres by 25.4 to get inches.
  3. Set Grout joint width to the spacer you plan to use: 0.0625 for 1/16 inch, 0.125 for 1/8 inch, 0.1875 for 3/16 inch. The manufacturer's installation information gives the narrowest joint that tile allows.
  4. Choose a Waste allowance. Start around 10% for a straight grid in a simple room and go higher for diagonal or herringbone layouts, many cuts around obstacles, or your first job with a tile cutter.
  5. Enter Tiles per box from the carton. If the carton lists only square feet, divide that by the area of one tile (length × width ÷ 144); for tile sold individually, enter 1.
  6. Add Price per box if you want a cost, or the price of one tile if you entered 1 per box. Then order the Box count, and check that every carton carries the same shade and lot code before any are opened.

The formula.

T = ⌈ ⌈A ⁄ (L+g)(W+g)⌉ × (1+w) ⌉

The estimate runs in four steps. First the module area: M = (L + g) × (W + g) ÷ 144, where L and W are the tile's length and width and g the grout joint, all in inches. Dividing by 144 converts square inches to square feet, since a square foot is 12 by 12 inches. Adding one joint to each dimension reflects how a grid repeats: every tile brings one joint along a long side and one along a short side, and the next tile starts where that joint ends.

Second, the raw count R = ⌈A ÷ M⌉, where A is the project area and the brackets mean round up to the next whole number. Third, the purchase count T = ⌈R × (1 + w)⌉, with w the waste allowance as a fraction (10% is 0.10). The allowance is applied to the already rounded raw count, so 10% of 60 tiles is exactly 6 more. Fourth, boxes B = ⌈T ÷ n⌉ for n tiles per carton, and cost C = B × p for a box price p. The box step carries its own hidden overage of anywhere from zero to n − 1 tiles.

Two assumptions sit inside the module. It describes a uniform grid where tiles and joints alternate across the whole surface, and it counts no offcuts: the cut pieces at the perimeter are paid for entirely by the waste allowance. It also assumes one tile size, so a pattern that mixes sizes needs each size run separately on its own share of the area.

How much each input moves the answer depends on the tile. On 60 square feet of 4-inch square tile, widening the joint from 1/8 to 3/16 inch lowers the raw count from 508 to 493, while raising the waste allowance from 10% to 15% lifts the purchase from 559 tiles to 585. On a 120-square-foot floor of 12 × 24 tile, the 1/8-inch joint changes nothing at all: the raw count is 60 with or without it.

A worked example.

Example

Take the default floor: 120 square feet of 12 × 24 inch tile with 1/8-inch joints, a 10% waste allowance, 8 tiles to a box at $42 a box. The module first. Adding the joint gives 12 + 0.125 = 12.125 inches by 24 + 0.125 = 24.125 inches, and 12.125 × 24.125 = 292.5156 square inches. Divided by 144, that is 2.0314 square feet per tile. The raw count is 120 ÷ 2.0314 = 59.07, which rounds up to 60 tiles. Adding 10% gives 60 × 1.10 = 66 tiles to buy. At 8 per carton, 66 ÷ 8 = 8.25, so the order is 9 boxes, which hold 72 tiles. The material costs 9 × $42 = $378. So the ninth carton delivers 6 tiles beyond the waste allowance, a ready-made repair stock from the same lot. It also changes the price per square foot. A carton holds 8 × 2 = 16 square feet of tile for $42, or $2.625 a square foot on the label, but once waste and the part-used box are paid for the floor costs $378 ÷ 120 = $3.15 for every square foot covered.

grout Width In0.125
price Per Box42
tile Length In12
tile Width In24
waste Percent10
tiles Per Box8
project Area Sq Ft120

Frequently asked questions.

How much extra tile should I allow for a herringbone or diagonal layout?
Both patterns meet the walls at an angle, so nearly every perimeter tile is cut and more offcuts end up unusable than with a straight grid. Allowances of 15% or more are common for these layouts, against roughly 10% for a straight lay. On the default floor, box rounding absorbs much of the difference: 15% means 69 tiles and 20% means 72, both still 9 boxes, while 25% means 75 tiles, 10 boxes and $420.
My tile is sold as 12 × 24 but measures 11.81 × 23.62 inches. Which size do I enter?
Enter the measured size. Product names are rounded, and many porcelain tiles are made to metric sizes: 300 × 600 mm is 11.81 × 23.62 inches. On the 120-square-foot example, the true size gives 61 raw tiles and 68 to buy instead of 60 and 66, though the order stays at 9 boxes. Over 1,000 square feet the nominal size would leave you two cartons short, 68 boxes against 70.
What is the narrowest grout joint I can use?
ANSI A108.02, the American installation standard, calls for a joint at least three times the actual variation in the tiles' face dimensions, and never narrower than 1/16 inch. Rectified tiles, ground to size after firing, vary little and can be set close to that minimum. Calibrated tiles, which are only sorted by size, need wider joints to absorb the differences between pieces. Use the joint the manufacturer recommends for your tile.
How do I estimate tile for a tub surround or shower walls?
Add up the tiled wall areas and enter the total. A 5-foot tub alcove tiled to 6 feet has a 5-foot back wall and two 2.5-foot end walls, 10 feet of wall in all, so 60 square feet. With 3 × 6 inch subway tile, 1/16-inch joints, 15% waste and 40 tiles a box, that is 466 tiles before waste, 536 to buy and 14 boxes. Niches, curbs and benches add surface and many small cuts.
The carton lists square feet, not pieces. How do I find tiles per box?
Divide the carton's coverage by the area of one tile. A 12 × 24 inch tile is 288 square inches, or exactly 2 square feet, so a carton labelled 16 square feet holds 8 tiles. The same figure turns a box price into a price per square foot: $42 for 16 square feet is $2.625. When a carton states both a piece count and a coverage, use the piece count.
Can I count mosaic sheets instead of individual tiles?
Yes: treat each sheet as one tile. Enter the sheet's length and width, set the grout joint to the gap you will leave between sheets (normally the same as the joints within the sheet, so the seams disappear), and enter sheets per box as tiles per box. The answer then comes back in sheets. Mosaics around drains, niches and curves need more cutting than their area suggests, so allow extra.
Should I include the floor under the toilet, vanity or cabinets?
A toilet sits on the finished floor, so the area under it is always tiled. Freestanding vanities and furniture-style pieces need tile underneath too. Built-in kitchen cabinets and fixed vanities are often installed first with the tile run up to their bases, in which case leave their footprint out. If you might replace the cabinets with a different layout later, tiling beneath them avoids an untiled patch.
How many leftover tiles are worth keeping after the job?
Keep every full tile that is left, stored with a carton label showing the shade and lot codes. Replacing one cracked tile years later is simple with a matching piece and difficult if the product has been discontinued or a new lot looks different. In the worked example the ninth carton leaves 6 tiles beyond the waste allowance, which is a sensible repair stock for a bathroom floor.
Does a staggered layout with 12 × 24 tiles need more tile than a grid?
ANSI A108.02 limits the offset to 33% for running-bond layouts of long rectangular tiles unless the manufacturer allows more, because a slight bow along a long tile shows as lippage when its high middle sits beside the end of the next tile. A 12 × 24 falls under that rule, so a third offset is the norm. Every staggered row ends in a cut, and whether the offcut can start another row decides how much extra you need.
Does the cost cover grout, thinset and trim pieces?
No. It is the box count multiplied by the box price. Thinset, grout, spacers, backer board, waterproofing membrane and edge trim are bought separately, as are bullnose or other finishing tiles, which are usually priced by the piece and measured by the length of exposed edge rather than by area. Sales tax and delivery are outside the figure too.

How this page was produced

Published by
Quanta Calculator
Primary sources
5 cited below
Method
T = ⌈ ⌈A ⁄ (L+g)(W+g)⌉ × (1+w) ⌉
Published
Last verified

Built with AI assistance and verified by automated tests against the cited sources — every worked example on this page is computed by the same code that runs the calculator. How we build and check calculators.

In this category

Embed

Quanta Pro

Paid features are coming later.

  • All 1560 calculators remain free
  • No billing is enabled
Coming soon