Paver Calculator

Work out pavers, bundles, base stone and bedding sand in cubic yards, edging pieces and paver cost for a patio or path from its dimensions and layer depths.

Paver Calculator

Length of the main paved section, in feet.
Width of the main paved section, in feet.
Optional second rectangular section length.
Optional second rectangular section width.
Add an irregular or pre-computed area in square feet.
Subtract planters, columns, or other cutouts.
Installed coverage of one paver from the product specification.
Allowance for cuts, breakage, and pattern inefficiency.
Leave at 0 if pavers are sold individually.
Compacted aggregate base thickness in inches.
Compaction / delivery allowance applied to base volume.
Bedding sand layer thickness in inches.
Allowance applied to bedding sand volume.
Total linear length needing edge restraint.
Length of one edge restraint piece.
Optional unit price for cost summary.
Optional base aggregate unit price.
Optional bedding sand unit price.
Optional edge restraint piece price.
Required paver count
617
Pavers needed to cover the waste-adjusted area, rounded up to a whole paver.
Net paved area
288
Waste-adjusted paver coverage area
308.16
Bundles or pallets
6
Ordered pavers (after bundle rounding)
720
Ordered paver coverage
360
Spare coverage after rounding
51.84
Base aggregate volume
96
Base order volume
4.0889
Bedding sand volume
24
Bedding sand order volume
0.9778
Edge restraint pieces
12
Paver material cost
561.60
Base aggregate cost
0.00
Bedding sand cost
0.00
Edge restraint cost
0.00

Background.

A paver patio arrives in four separate deliveries: the pavers, crushed stone for the base, a thin layer of sand to bed them in, and a run of edging that stops the whole surface creeping outward. Each is sold in its own unit. Pavers come by the piece or the pallet, stone and sand by the cubic yard, edging by the length, and the yard itself is measured in feet. Most short orders happen in the conversion from one to another.

Take an 18 by 14 foot patio with a 12 by 3 foot path leading up to it. That is 288 square feet of finished surface. Add 7 percent for cuts and breakage, use a paver that covers half a square foot, and you need 617 pavers. If the supplier sells them 120 to a bundle, you buy six bundles, which is 720 pavers. Underneath, a 4-inch base comes to just over 4 cubic yards of stone once a compaction allowance is added, and an inch of bedding sand to a little under one cubic yard. Ninety-four feet of edging in 8-foot lengths is 12 pieces.

The rounding is where the money goes. Those 720 pavers cover 360 square feet, a full quarter more than the 288 you are paving, and the jump is set by the bundle size as much as by the waste allowance: with no waste at all, the same patio would need 576 pavers and five bundles, and it is the 7 percent that tips it into a sixth. Seeing that before you order lets you ask the supplier for a part bundle, or decide the 103 leftover pavers are worth keeping. Concrete pavers from a later production run rarely match the colour of the first exactly, so a small stack kept back is the easiest way to repair a cracked or stained unit years later.

What is paver calculator?

A segmental paver surface is built in layers. On top sit the pavers, most often 60 mm (about 2⅜ inches) thick for patios and paths. Beneath them is a screeded layer of coarse sand, usually about an inch, that the pavers are pressed into when the surface is vibrated. Below that is the base: compacted crushed stone that spreads the load onto the native soil and is the layer that decides whether the patio stays flat. Sand swept into the joints locks neighbouring pavers together, and an edge restraint holds the outside row in place. This calculator quantifies the pavers, the base, the bedding sand and the edging. It does not choose how thick the base should be. That depends on soil, drainage, frost and whether vehicles will drive on the surface, so it should come from the paver manufacturer, an installer or the project drawings. ASTM C936 is the US product standard for solid concrete interlocking paving units, and the Federal Highway Administration's tech brief describes permeable interlocking pavement, which swaps the sand layers for open-graded stone.

How to use this calculator.

  1. Measure the main paved area as a rectangle and enter its length and width in feet. For an L-shaped patio, put the largest rectangle here; this section must be larger than zero.
  2. Enter a path or second rectangle in the walkway fields (both dimensions must be above zero for it to count). Add any odd shape you have measured yourself, such as a round fire-pit pad, as a custom area in square feet, and enter as excluded area anything inside the outline that will not be paved: a tree pit, a fixed planter, a drain grate.
  3. Enter the coverage of one paver from the product sheet. If the sheet lists pavers per square foot instead, divide 1 by that number: 4.5 per square foot is 0.2222 square feet each. Set the waste allowance; 7 percent suits a plain layout laid square to the edges, and diagonal patterns, curves and obstacles need more.
  4. Enter how many pavers come in a bundle or pallet. If the yard sells loose pieces, enter 1 and the order will equal the paver count.
  5. Enter the base depth and bedding sand depth in inches as specified, with an ordering factor for each (15 and 10 percent by default) to cover compaction and spreading loss. Measure only the edges that need restraint, leaving out runs along a house wall, a step or an existing slab, and enter the length of one edging piece.
  6. Enter the price of one paver to get the paver material cost. The base, sand and edging price fields do not currently change any figure shown, so price those layers from the order volumes and piece count with your supplier.

The formula.

N = ⌈A × (1 + w) ⁄ aₚ⌉

Everything starts from the net paved area: A = L₁ × W₁ + L₂ × W₂ + custom area − excluded area, held at zero if the exclusions are larger than the rest. The paver count is N = ⌈A × (1 + w) ⁄ aₚ⌉, where w is the waste allowance as a fraction (7 percent is 0.07) and aₚ the coverage of one installed paver in square feet; the ceiling brackets mean round up to the next whole paver. With a bundle size n, the order becomes ⌈N ⁄ n⌉ bundles, the ordered pavers are that many bundles times n, and the spare coverage is the ordered pavers times aₚ minus the waste-adjusted area A × (1 + w). Spare coverage therefore sits on top of the waste allowance rather than replacing it.

The two layers below are volumes. Base volume in cubic feet is A × d_b ⁄ 12, with the depth d_b in inches; dividing by 27, the exact number of cubic feet in a cubic yard (NIST Handbook 133), gives cubic yards, and multiplying by (1 + f_b ⁄ 100) applies the ordering factor. Bedding sand follows the same steps with its own depth and factor. Note that both layers use the net area A without the paver waste allowance, and without any strip of base carried past the paved edge, so their ordering factor is their only margin. Edging is ⌈E ⁄ ℓ⌉ pieces for an edge length E and piece length ℓ, and the paver cost is the ordered pavers, whole bundles included, times the unit price. The base, sand and edging costs follow the same pattern: the order volume in cubic yards times the price per cubic yard for base and sand, and the whole edge pieces times the price per piece for edging.

Because the count is rounded up twice, small changes in waste can cost nothing or a whole bundle. On the example patio, 7 and 10 percent waste both land on six bundles, while dropping to zero falls back to five. Check where the bundle boundary sits before you argue over a percentage point.

A worked example.

Example

The patio measures 18 by 14 feet, which is 252 square feet, and the path 12 by 3 feet, which adds 36. Nothing is excluded, so the net area is 288 square feet. Adding 7 percent waste gives 288 × 1.07 = 308.16 square feet of paver coverage to buy. Each paver covers 0.5 square feet, so 308.16 ÷ 0.5 = 616.32, rounded up to 617 pavers. At 120 per bundle, 617 ÷ 120 = 5.1417, which becomes 6 bundles, or 720 pavers. Those cover 720 × 0.5 = 360 square feet, leaving 360 − 308.16 = 51.84 square feet of spare coverage beyond the waste allowance. At 0.78 each, the 720 pavers cost 561.60; the 617 actually needed would have cost 481.26, so 80.34 of the bill is the price of whole bundles. The 4-inch base is 288 × 4 ÷ 12 = 96 cubic feet, and 96 ÷ 27 = 3.5556 cubic yards. With the 15 percent ordering factor that becomes 4.0889 cubic yards, so order a little over 4 yards. The inch of bedding sand is 288 ÷ 12 = 24 cubic feet, or 0.8889 cubic yards, and 0.9778 cubic yards after its 10 percent factor: one yard of sand covers it. The 94 feet of edge divided into 8-foot lengths is 11.75, rounded up to 12 pieces.

base Depth In4
pavers Per Bundle120
paver Cost Each0.78
secondary Length Ft12
sand Depth In1
edge Length Ft94
custom Area Sq Ft0
secondary Width Ft3
paver Coverage Sq Ft0.5
section Length Ft18
edge Piece Length Ft8
waste Percent7
section Width Ft14
excluded Area Sq Ft0
base Ordering Factor Percent15
sand Ordering Factor Percent10

Frequently asked questions.

How do I turn a paver's size into coverage per paver?
Multiply the nominal length by the width in inches and divide by 144. A 4 by 8 inch brick-style paver covers 32 ÷ 144 = 0.2222 square feet, or 4.5 pavers per square foot; a 6 by 9 inch unit covers 0.375; a 12 by 12 covers exactly 1. Nominal sizes already include the joint, which is why the actual paver measures slightly less. If the manufacturer publishes coverage per pallet or units per square foot, use that instead, especially for multi-size patterns sold as a set.
How much waste should I allow for herringbone or curved edges?
More than the 7 percent default. A running bond laid square to straight edges only needs cuts along two sides, while a 45-degree herringbone or a curved border puts an angled cut on nearly every edge piece, and each obstacle inside the patio adds a ring of cuts around it. Raise the allowance for those layouts and watch the bundle count: on the example patio, 10 percent waste still fits in six bundles, so the extra margin costs nothing there.
Why is the cost based on 720 pavers when I only need 617?
Because the price multiplies the pavers you will actually be sold, and the supplier sells whole bundles of 120. The example's 617 pavers would cost 481.26 at 0.78 each, but six bundles cost 561.60. Many yards will break a pallet for a fee or take back unopened bundles, so ask. Otherwise keep the spares: they are the only pavers guaranteed to match your colour batch when one cracks later.
How deep do I need to dig for a paver patio?
Add the paver thickness, the bedding sand and the compacted base. A 60 mm (2⅜ inch) paver on 1 inch of sand and 4 inches of base needs about 7.375 inches below finished height. Over the example's 288 square feet that is 177 cubic feet, or 6.5556 cubic yards, of soil to remove, before allowing for the slope you want for drainage or for widening the dig past the edges. That spoil volume is not one of the results, so work it out separately.
Is a 4-inch base deep enough?
For a patio or path on firm, well-drained ground it is a common starting point, which is why it is the default. Soft clay, poor drainage, frost and vehicle traffic all call for a deeper base, and a driveway needs a section designed for its loads. Check the manufacturer's installation guide or your installer's specification and enter that depth. Adding extra bedding sand is not a substitute; a thick sand layer tends to shift and rut under the pavers.
Can I order the base stone in tons instead of cubic yards?
Yes, but the conversion depends on the stone. Crushed aggregate varies in weight per cubic yard with the rock type, the grading and how wet it is, so ask the quarry or yard for the density of the product you are buying and multiply the cubic-yard order by it. The ordering factor here already allows for the stone settling as it is compacted, so do not add a second compaction allowance on top.
Do I need edging where the patio meets the house?
Usually not. Edge restraint is there to stop the outer pavers sliding outward, and a house foundation, a concrete step or an existing slab already does that job. Measure only the open edges that border lawn, beds or gravel. In the example, 94 feet of edge needs 12 eight-foot pieces; dropping a 14-foot run along a wall would leave 80 feet and 10 pieces.
Does the sand figure include the sand for the joints?
No. The bedding sand volume covers only the layer the pavers sit on. Joint sand, whether plain or polymeric, is swept in after the pavers are laid, and how much a given area takes depends on the paver shape, joint width and chamfered edges. Polymeric sand bags usually state a coverage range for typical paver sizes on the label, which is the easiest way to estimate it.
Can I use this for permeable pavers?
For the paver count, yes. The layers are different, though. In a permeable interlocking pavement the joints and the bedding layer are open-graded small stone rather than sand, and the base and often a deeper subbase are open-graded stone designed to hold rainwater while it soaks away, as the Federal Highway Administration's tech brief describes. Enter those layer depths if you have them, but the depth of a permeable section is a drainage design, not something to guess.

How this page was produced

Published by
Quanta Calculator
Primary sources
5 cited below
Method
N = ⌈A × (1 + w) ⁄ aₚ⌉
Published
Last verified

Built with AI assistance and verified by automated tests against the cited sources — every worked example on this page is computed by the same code that runs the calculator. How we build and check calculators.